1. ELECTROENERGETICS
1.1. POWER (TRANSFORMER) SUBSTATIONS
A. Constructions
1. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 2*1000kVA, JAMNICA, Jana Bottling Plant, St. Jana.
2. Design of the extension of the power substation
10(20)/0.4kV, 2*1000kVA to the level of TS
10(20)/0.4kV, 4*1000kVA, delivery of equipment, installation, testing and start-up of the power substation, JAMNICA, Jana Bottling Plant, St. Jana.
3. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 2*1000kVA, ARMKO, Konjscina Plant.
4. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, LURA, Zagreb Plant.
5. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*630kVA, RALU, Sesvete Plant.
6. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*400kVA, KRMIVA, Bratina Plant.
7. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*400kVA, Rakitovica, Jastrebarsko.
8. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*400kVA, Recka cesta, Jastrebarsko.
9. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*400kVA, Rasadnik, Jastrebarsko.
10. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 2*1000kVA, COCA COLA BEVERAGES, Gotalka Bottling Plant, Gotalovec.
11. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 2*630kVA, Semmelrock, through UDIKOVIC d.o.o..
12. Design, delivery of equipment, installation, testing and start-up of the MV 20kV switchgear unit, Bosiljevo 2 junction, through DALEKOVOD d.d..
13. Delivery of equipment, installation, testing and start-up of a MV 20kV SF6 insulated switchgear unit, Asphalt Production, Ceste Karlovac.
14. Installation of a MV 20kV SF6 insulated switchgear unit, VETROPACK STRAZA Glassworks, Hum na Sutli.
15. Execution design, delivery of equipment, installation, testing and start-up of 3 pieces of the power substation 10(20)/0.4kV, 2*1000kVA and middle-voltage distribution, BUSINESS park Zagreb, Sveta Nedelja.
16. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 2*1000kVA, HS PRODUKT, Karlovac Plant.
17. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 2*1000kVA, UNIJAPAPIRI, Novi Dvori Plant, Zapresic.
18. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, KAPLAST, Vojnic Plant.
19. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 3*1000kVA, RADIN GRAFIKA, Sveta Nedelja Plant.
20. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 2*1000kVA, KONZUM, Location Sibice, Zapresic.
21. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 2*1000kVA, KONZUM, LDC II, Zagreb.
22. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, BAUMAX, Location Sesvete, Zagreb.
23. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 2*1000kVA, KONZUM, Location Oporovecka-Dankovecka, Zagreb.
24. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, KONZUM, Location Vrbovec.
25. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, KONZUM, Location Botinec, Zagreb.
26. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, KONZUM, Location Ivanic Grad.
27. Delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, C-PACK, Sveta Helena Plant.
28. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, KONZUM, Location Velika Gorica.
29. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, KONZUM, Location Sarajevska, Zagreb.
30. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, KONZUM, Location Dubec, Zagreb.
31. Design, delivery of equipment, installation, testing and start-up of the power substation 10(20)/0.4kV, 1*1000kVA, PHARMAS, Popovaca Plant. |
|