1. ELECTROENERGETICS
1.1. POWER (TRANSFORMER) SUBSTATIONS
B. Reconstructions
1. Reconstruction of the power substation TS ZDENCINA, Zdencina.
Reconstruction design of TS 110/20/10kV, 1*20MVA to TS 110/20/10(20), 2*20MVA.
2. Reconstruction of the power substation TS 1252 LURA, Zagreb Plant.
Reconstruction design of TS 10/0.4kV, 4*630kVA to TS 10(20)/0.4 kV, 4*1000kVA, delivery of equipment, installation, testing and start-up.
3. Reconstruction of the power substation TS 555 LURA BEVERAGES, Zagreb Plant.
Reconstruction design of TS 10/0.4kV, 2*630kVA to TS 10(20)/0.4 kV, 2*1000kVA, delivery of equipment, installation, testing and start-up.
4. Reconstruction of the power substation TS JAMNICA, Pisarovina Bottling Plant.
Reconstruction design of TS 10/0.4kV, 2*630kVA to TS 10(20)/0.4 kV, 2*630+1000kVA, delivery of equipment, installation, testing and start-up.
5. Reconstruction of the old power substation TS HS PRODUKT, Karlovac Plant.
Reconstruction design of TS 10/0.4kV, 1*630kVA to TS 10(20)/0.4kV, 2*630kVA, delivery of equipment, installation, testing and start-up.
6. Reconstruction of the power substation TS LURA-SOMBOLED, Sombor Plant.
Reconstruction design of TS 20/0.4kV, 1*1000kVA to TS 20/0.4kV, 1*1600kVA, delivery of equipment, installation, testing and start-up.
7. Reconstruction of the power substation TS HERUC, Zagreb Plant.
Reconstruction of TS 10/0.4kV, 1*1000kVA to TS 10(20)/0.4 kV, 2*1000kVA, delivery of equipment, installation, testing and start-up.
8. Reconstruction of the power substation TS ZAGREB BREWERY, Zagreb Plant.
Reconstruction design, delivery of equipment, replacement of MV 20kV SF6 insulated switchgear unit. Replacement of old 1000kVA 10/0.4 kV oil transformers with new dry 1000kVA 10(20)/0.4 kV transformers (4 pieces), testing and start-up.
9. Reconstruction of the medium-voltage distribution in the power substation TS 2, 3*1600kVA, FRIKOM, Frozen foods factory, Belgrade.
Reconstruction design, delivery of equipment, installation, testing and start-up of MV 20kV SF6 insulated switchgear unit.
10. Reconstruction of the low-voltage distribution in power substation TS 4*630kVA, LURA, Bjelovar Plant.
Reconstruction design, delivery of equipment, installation, testing and start-up.
11. Reconstruction of the low-voltage distribution in power substations TS 270-2, 2*630kVA and
TS 270-3, 2*630kVA, LEDO, Zagreb Plant.
Reconstruction design, delivery of equipment, installation, testing and start-up.
12. Reconstruction of the low-voltage distribution in power substation TS 2*1000kVA, DTR Underwear Manufacture, Zagreb Plant.
Reconstruction design, delivery of equipment, installation, testing and start-up.
13. Reconstruction of the power substation TS Crnilovec, Jastrebarsko.
Reconstruction design of TS 10/0.4kV, 1*400kVA to TS 10(20)/0.4kV, 1*400kVA, delivery of equipment, installation, testing and start-up.
14. Reconstruction of the power substation TS Institut, Jastrebarsko.
Reconstruction design of TS 10/0.4kV, 1*400kVA to TS 10(20)/0.4kV, 1*400kVA, delivery of equipment, installation, testing and start-up.
15. Reconstruction of the power substation TS Vojna posta, Jastrebarsko.
Reconstruction design of TS 10/0.4kV, 1*400kVA to TS 10(20)/0.4kV, 1*400kVA, delivery of equipment, installation, testing and start-up.
16. Reconstruction of the power substation TS Pavlovcani, Jastrebarsko.
Reconstruction design of TS 10/0.4kV, 1*400kVA to TS 10(20)/0.4kV, 1*400kVA, delivery of equipment, installation, testing and start-up.
17. Reconstruction of the power substation TS Donja Reka, Jastrebarsko.
Reconstruction design of TS 10/0.4kV, 1*400kVA to TS 10(20)/0.4kV, 1*400kVA, delivery of equipment, installation, testing and start-up.
18. Reconstruction of the medium-voltage distribution in the power substation TS 403, 2*630kVA, ZVIJEZDA Oil Manufacture, Zagreb Plant.
Delivery of equipment, installation, testing and start-up of a MV 20kV switchgear unit in TS 403 and a 20kV cable between TS 403 and power substation of AGROKOR Regional Distribution Centre.
19. Replacement of old transformers 630kVA 10/0.4kV with new 630kVA 10(20)/0.4kV transformers in the power substation TS 270-1, 3*630kVA, LEDO, Zagreb Plant.
Delivery of equipment, installation, testing and start-up.
20. Reconstruction of the power substation TS KONCAR POWER TRANSFORMERS, Zagreb Plant.
Reconstruction design of TS 10/0.4kV, 2*630kVA to TS 10(20)/0.4kV, 2*1000kVA, delivery of equipment, installation, testing and start-up.
21. Reconstruction of the power substation TS 403 ZVIJEZDA Oil Manufacture, Zagreb Plant.
Reconstruction design of TS 10/0.4kV, 2*630kVA to TS 10(20)/0.4kV, 2*1000kVA, delivery of equipment, installation, testing and start-up.
22. Reconstruction of the power substation TS KALNICKE VODE, Apatovec Bottling Plant.
Reconstruction design of TS 10(20)/0.4kV, 3*1000kVA, delivery of equipment, installation, testing and start-up.
23. Reconstruction of the power substation TS-4 DISTRIBUTIVE AND SPECIAL TRANSFORMERS (D&ST), Zagreb Plant.
Reconstruction design of TS 10/0.4kV, 2*630kVA to TS 10(20)/0.4kV, 2*1000kVA, delivery of equipment, installation, testing and start-up.
24. Reconstruction of the medium-voltage distribution in the power substation TS 10(20)/0.4kV, 2*630kVA, DRVOPROIZVOD, Jastrebarsko Plant.
Delivery of equipment, installation, testing and start-up of MV 20kV SF6 insulated switchgear unit.
25. Replacement of old transformers 630kVA 10/0.4kV with new 630kVA 10(20)/0.4kV in the power substation TS 270-2, 2*630kVA, LEDO, Zagreb Plant.
Delivery of equipment, installation, testing and start-up.
26. Reconstruction of the power substation TS CRNOMEREC, KONZUM, Location Crnomerec, Zagreb.
Reconstruction design of TS 10/0.4kV, 2*1000kVA (displacement of the metering location), delivery of equipment, installation, testing and start-up.
27. Reconstruction of the power substation TS STRUGE, INA, Location Struge, Zagreb.
Reconstruction design of TS 6/0.4kV, 2*1000kVA to TS 10(20)/0.4kV, 2*1000kVA, delivery of equipment, installation, testing and start-up. |