6. MISCELLANEOUS
1. Preparation of the conceptual, main and final design of electrical energy supply lines and power substation New energy plant, KARLOVAC BREWERY, Karlovac Plant.
2. Repair of 2 induction regulators with rated power of 480kVA each, ZVIJEZDA Oil Manufacture, Zagreb Plant.
3. Preparation of the conceptual, main and final design of a Main distribution cabinet, rated current 630A, TRANSMITTERS AND COMMUNICATIONS (OiV), Transmitter Mirkovica.
4. Manufacture of half-controlled thyristor rectifier with a transformer 14 V, 1000 A, Galvanization drive, VIJCANE PUMPE, Zagreb Plant.
5. Preparation of the conceptual and main design of electrical energy supply lines and power substations KIM-2 and KIM-3, LACTALIS, Karlovac Plant.
6. Preparation of the technical solution and design for the power substation TS 0.4/10(20)kV, 1600kVA, Biogass power plant Pisarovina. |